Port of London Authority staff perform a wide range of duties that facilitate the safe navigation of the tidal Thames for all users. entering or leaving the port. Inside the sealed blast bay, Tony goes to work on the river-worn furniture. The shot and debris falling off the buoy is collected by a drain on the floor. A mechanism connected to the drain shifts used shot back into the compressor, so that it can be used over and over again. “After the shotblasting is done we spray the buoy with Intershield, aluminium paint, and later coat it in dark grey Interguard paint”, Tony said. “The process binds the paint with the metal but the two coats must be applied within 48 hours of each other so that the bonding happens properly.” Multipurpose deckhand Tony says getting one nav buoy as good as new can take around a week, but the length of time varies according to the buoy’s size and state. “I really enjoy shotblasting, cleaning up and spraying buoys or whatever else, just seeing a job through. Completing the job is very satisfying because you can see the buoy is in a better state than it was before. It’s an important job because it helps keep the river safe.” Find out more about the PLA’s work on 95 miles of the River Thames:
|
Port of London Authority, London River House, Royal Pier Road, Gravesend, Kent DA12 2BG. +44 (0) 1474 562200